eISSN:2278-5299

International Journal of Latest Research in Science and Technology

DOI:10.29111/ijlrst   ISRA Impact Factor:3.35

A News Letter Sign UP!
OPTIMIZE METHOD OF ENGINEERING EXECUTION PLAN THROUGH MULTIPLE DESIGN CENTERS

Research Paper Open Access

International Journal of Latest Research in Science and Technology Vol.1 Issue 3, pp 264-265,Year 2012

OPTIMIZE METHOD OF ENGINEERING EXECUTION PLAN THROUGH MULTIPLE DESIGN CENTERS

ARUMUGA RAJ A.P.

Correspondence should be addressed to :

Received : 23 October 2012; Accepted : 26 October 2012 ; Published : 31 October 2012

Share
Download 125
View 179
Article No. 10068
Abstract

This paper proposes a method of engineering execution plan in Project Execution in engineering industries is a real world problem faced by industries. Increasing number of projects, high cost and stiff competition have posed a challenge to the EPC contractors for efficient allocation of project execution resource. Project management is not a task to be undertaken lightly. Quite apart from the time needed to undertake a project there can be many problems that are unique in world. A crucial decision that use multiple design centers worldwide for futures .Today’s global, fast-track projects require engineering, procurement, and construction (EPC) contractors to successfully manage and perform projects involving concurrent participation of multiple design centers worldwide, while still keeping a handle on project schedule and costs. They also have the need to preserve their “best practice” design information for re use on the future projects, to increase productivity and preserve their corporate knowledge. The results of the engineering execution plan have demonstrated the effectiveness of the proposed method to improve the optimize method of engineering execution to use multiple design centers.

Key Words   
Engineering, procurement, and construction (EPC) contractors, Engineering execution plan (EEP)
Copyright
References
  1. Hesse, Rick, Managerial Spreadsheet Modeling and Analysis, 1997. Richard D. Irwin Publishing, Chicago, Illinois.
  2. Kerzner, Harold, Project Management, A Systems Approach to Planning, Scheduling, and Controlling. 1995. Van Nostrand Reinhold, New York.
  3. Project Management Institute. Project Management Institute Practice Standard for Work Breakdown Structures, Second Edition (2006).
To cite this article

ARUMUGA RAJ A.P. , " Optimize Method Of Engineering Execution Plan Through Multiple Design Centers ", International Journal of Latest Research in Science and Technology . Vol. 1, Issue 3, pp 264-265 , 2012


Responsive image

MNK Publication was founded in 2012 to upholder revolutionary ideas that would advance the research and practice of business and management. Today, we comply with to advance fresh thinking in latest scientific fields where we think we can make a real difference and growth now also including medical and social care, education,management and engineering.

Responsive image

We offers several opportunities for partnership and tie-up with individual, corporate and organizational level. We are working on the open access platform. Editors, authors, readers, librarians and conference organizer can work together. We are giving open opportunities to all. Our team is always willing to work and collaborate to promote open access publication.

Responsive image

Our Journals provide one of the strongest International open access platform for research communities. Our conference proceeding services provide conference organizers a privileged platform for publishing extended conference papers as journal publications. It is deliberated to disseminate scientific research and to establish long term International collaborations and partnerships with academic communities and conference organizers.